The bottom portion lines up the rail for a smooth even weld.         
Once that's done, the top portion is put into place for the actual weld.
Date: 11/9/2010 Location: Everett, OH   Map Show Everett on a rail map Views: 62 Collection Of:   Fred Stuckmann
Author:  Fred Stuckmann
The bottom portion lines up the rail for a smooth even weld.
Picture Categories: Action This picture is part of album:  CVSR MoW.
Share
User Comments Contributor does not allow comments on their photos.
Link to this page: http://www.rrpicturearchives.net/showPicture.aspx?id=2300874