The northeast wall of the former C&NW depot at Spooner, WI on 23 Jun. '16. The opposite end of the depot receives the most attention from photographers because that is the end visitors first see when they arrive, so I thought I would post a photograph of this equally interesting end of this historic railroad structure. Constructed in the Craftsman style for the CStPM&O (CMO) in ‘02 by Ashland, WI contractor T. E. Pugh. It measured 288’ long by 32’ wide (52’ wide with the overhangs) and cost $25,000. The northern half had a second story for railroad offices. Passenger service ended in ’61. The northern half of the depot was demolished in ’63. The remaining portion has been home to the Railroad Memories Museum since ’90. The last freight train passed by in ’92. |